Bottom Cup

Product Image (01)

Top Cup Bottom Cup

  • Technique:Forged
  • Surface Treatment:Pre-Galvanized
  • Application:Construction
  • Material:Steel
  • Delivery Time:10 Days
  • Supply Ability:5000 Per Month
Product Image (02)

Bottom Cup Scaffolding

  • Supply Ability:5000 Per Month
  • Delivery Time:10 Days
  • Application:Construction
  • Material:Steel
  • Surface Treatment:Pre-Galvanized
  • Sleeve size:Different Available
Product Image (03)

Scaffolding Bottom Cup

  • Surface Treatment:Pre-Galvanized
  • Sleeve size:Different Available
  • Application:Construction
  • Material:Steel
  • Supply Ability:5000 Per Month
  • Delivery Time:10 Days
Product Image (04)

Scaffolding Bottom Cup

  • Application:Construction
  • Product Type:Other, Scaffolding Bottom Cup
  • Diameter:Different Available Millimeter (mm)
  • Material:Aluminum
  • Thickness:Different Available Millimeter (mm)
  • Delivery Time:7 Days
  • Supply Ability:500 Per Month
X


Back to top
trade india member
VIJAY ENGINEERS All Rights Reserved.(Terms of Use)
Developed and Managed by Infocom Network Private Limited.